More than a dozen pallets of greyblock are now positioned on the site to be placed on the footings and create the basin into which the concrete slab will be poured.

You can tell how far up the grayblock needs to go: the wood framing on the far side of the site shows where the finished floor elevation will be. We’ll use architectural block for the course that brings us to that level (and then to where people can see it), but grayblock all the way down. As you can see, there’s quite a number of courses to reach that point, which looks like “up” right now, but will seem “down” when the slab is poured and ultimately the dirt, which is also in the background, is replaced. Here you can see how “high” (or “deep”) we’ll be going:
Continue reading “Construction photos: week 5 (grayblock below grade)”



